Peedie Kirk United Reformed Church in Kirkwall, Orkney received funding to install solar PV panels and battery storage. The Kirk wanted to use as much of the energy generated by the solar panels as possible and installed battery storage so that they could save excess energy to be used at a different time. The members estimate that they can produce 1750kw each year from a 6kw solar PV system combined with 7.5kwh of battery storage.

Alford and District Men’s Shed (ADMS), a community building in rural Aberdeenshire, installed a whole energy system powered by renewable energy. It includes solar PV, air source heat pumps, a thermal store, batteries and controls. Funding of £14,820 was used for technical assistance for an options appraisal, design specification and procurement to identify the best options, with £84,875 received to cover the actual works. The system enables the members to maximise the on-site use of the energy generated by the solar PV and to optimise the use of each component.